1.Property Name |
DUNCAN SENIOR HIGH SCHOOL |
2.Resource Name |
DUNCAN SR. HIGH SCHOOL |
3.Address |
224 NORTH NINTH STREET |
4.City |
DUNCAN |
5.Vicinity |
|
6. County |
Stephens |
7.Lot |
9-24 |
8.Block |
122 |
9.Plat Name |
CITY OF DUNCAN |
10.Section |
5 |
11.Township |
1S |
12.Range |
7W |
13a.Latitude (North) |
34.5050127
|
13b.Longitude (West) |
-97.9576216
|
14a.UTM Zone |
|
14b.Northings |
|
14c.Eastings
|
|
15.Resource Type |
Building |
16.Historic Function |
School |
17.Current Function |
School |
18.Area of significance, Primary |
ARCHITECTURE |
19.Area of significance, Secondary |
NO DATA |
20.Description of Significance |
THIS PROPERTY IS A CONTRIBUTING RESOURCE TO THE CENTRAL RESIDENTAL DISTRICT AND IS ELIGIBLE FOR THE NRHP |
21.Document Resource |
FIELD SURVEY |
22.Name of the Preparer |
KIM JONES// JENNIFER SPENCER |
23.Survey Project |
YES
Project Name:
WPA SURVEY, III// 2000 SURVEY OF DUNCAN
|
24.Date of Preparation |
JULY 27, 1987// FEB. 2000 |
25.Photographs |
Yes
Year:
1987// 2000 |
26. Architect/Builder |
J.B. WHITE (PWA PROJECT #8453) |
27. Year Built |
1936 |
28.Original Site |
Yes
Date Moved:
N/A |
From Where |
N/A |
29.Accessible |
Yes |
30.Architectural Style |
OTHER |
Other Architectural Style
|
WPA STYLE |
31.Foundation Material |
CONCRETE |
32.Roof Type |
FLAT |
33.Roof Material |
UNCOLLECTED |
34.Wall Material (Primary) |
BRICK |
35.Wall Material (Secondary) |
NO DATA |
36.Window Type |
FIXED, AWNING, CASEMENT |
37.Window Material |
METAL |
38.Door Type |
GLAZED SLAB |
39.Door Material |
METAL |
40.Exterior Features |
STEPPED PARAPETS, METAL AWNINGS |
41.Interior Features |
|
42.Decorative Details |
USE OF CONTRASTING COLORS OF BRICK AND PATTERNED BRICKWORK |
43.Condition of Resource |
Good (very well maintained) |
44.Description of Resource |
TWO STORY BUFF BRICK CLAD WPA STYLE BUILDING. IT SPANS THE LENGTH OF A BLOCK AND CONSISTS OF THREE PARTS: A MAIN ENTRANCE, GYMNASIUM, AND AUDITORIUM. THE MAIN ENTRANCE IS MARKED BY BRICKWORK THAT IS RAISED IN ORDER TO CREATE THE APPERANCE OF PILASTERS. THE PILASTERS ARE DECORATED WITH THREE STRIPES OF DARKER COLORED SOLDIER BRICKS. THE DOORS ARE SLIGHTLY RECESSED AND SET BENETH A SEMICIRCULAR METAL AWNING. THE FACADES OF THE GYMNASIUM AND AUDITORIUM ARE SIMILAR TO ONE ANOTHER AND HAVE PROMINENT STEPPED PARAPETS. DECORATIVE BRICK WORK CREATES THE IMPRESSION THAT THERE ARE FOUR PILASTERS. EACH OF THE PILASTERS HAS A CONCRETE CAP AND ALTERNATING BANDS OF LIGHT AND DARK COLORED BRICK. WINDOWS FILL THE WALL SPACE BETWEEN THE PILASTERS ON THE SECON FLOOR ON THE GYM, HOWEVER THIS IS NOT THE CASE ON THE AUDITORIUM. INSTEAD ONLY A SMALL WPA PLAQUE OCCUPIES ONE OF THE SPACES. THIS BUILDING WAS COMPLETED AS PWA PROJECT #8453. |
45.Comments |
|
46.Placement |
SEE SURVEY MAP |
47.Listed on National Register |
Eligible |
Continuation: |
|
National Register Entry |
No Data |
Date Updated (mm/dd/yyyy) |
12/14/2021 12:52:14 PM |
|